精品国产丝袜一区二区三区乱码_亚洲欧美日韩专区精品伊人久久_亚洲精品在在线观看_YY6080理论片在线电影_在线免费中文字幕av影院_黄色一级片毛片视频_久久精品亚洲综合专区_亚洲一区二区无码中文字幕麻豆_美女被啪啪激烈爽到喷水_h肉动漫无码无修在线观看下载

unified benefit
Location: Home > News > Technology Centre > The correct installation method of sifter box body

The correct installation method of sifter box body

2024-02-29 15:08:55
visit:0

  As one of the most commonly used vibratory screening equipment, the screen material machine is deeply favoured by the vibrating screen users because it has the characteristics of large output, high screening efficiency, easy maintenance and so on.

  Usually, the production of screening machine is the whole machine delivery, so the user basically do not have to consider the problem of screening machine equipment assembly, but there are some individual users for some special reasons require the equipment to be disassembled and shipped, which is the request of the user to receive the equipment assembled on their own; there are some times when the screening machine users in the case of the box appears unrepairable faults, the need to replace the box, or repair equipment, long-distance movement of the equipment also need to be equipment Disassembly, which also involves the problem of self-assembly.

165716_87758.jpg

  Step 1: Place the stand

  The sieve machine sieve machine bracket on the horizontal ground, pay attention to the bracket should be placed towards the top, do not put upside down, to the spring base on the bracket as a reference, the spring base towards that is so far.

  Step 2: anti-skid bracket

  The bracket should do anti-skid measures to avoid the phenomenon of movement in the installation of the sieve machine chassis, you can find a few pieces of rubber rubber pads in the bracket under the bracket, you can also use the ground bolts or other measures to fix the bracket first, placing it in the installation is to move.

  Step 3: Place the spring

  Place the spring on the bracket, should ensure that the height of all the springs are the same, the spring can not appear obvious horizontal phenomenon.

  Step 4: Prepare the box

  Usually if the customer requires the sieve machine disassembled for shipment, the general shipment of the vibration motor has been installed in the box, of course, there is no vibration motor installed in the box on the shipment of the case; the user in the dismantling of the sieve machine for repair, maintenance, but also may be removed from the vibration motor, then this step can be divided into the following two cases:

  1, the vibration motor has been installed on the box

  Vibrating motor installed in the box on the shipment, in order to transport safety, screening machine box will be inverted, that is, the vibration motor is placed towards the top, in this case, the user needs to turn the screening machine box body over, so that the vibration motor is facing down.

  2、Vibrating motor is not installed on the box body

  In this case, the user should first invert the screen box body and install the vibration motor on the motor base located in the lower part of the box, and then turn the screen box body over so that the vibration motor is facing down.

  Step 5: Place the box

  Lift the prepared linear vibrating box body and place it stably on the spring, so that the screening machine box installation is completed.


TAG

About Products

CopyRight © 2024Dongguan Tongyi Plastic Machinery Manufacturing Co., Ltd Sitemap
WeChat

【W(wǎng)eChat】

Link: